Two arcade machine quotations may show similar cabinets and still describe very different products.
One price may include the approved software, payment configuration, export packaging, spare parts, and final testing. Another may cover only the basic machine, with important details left unresolved until production.
A useful comparison should answer three questions: Are both suppliers quoting the same machine? Can they prove what will be delivered? Can they support the same configuration after the sale?
Confirm the Same Technical Scope First
Do not compare prices until both quotations describe the same specification. A model name, product photo, or player count is not enough.
Confirm the cabinet dimensions and materials, screen, PCB, software version, player capacity, I/O board, wiring harness, power supply, controls, payment system, language, credit settings, and included accessories.
A lower quotation may simply use a different screen, simpler wiring, another board, or an unconfirmed payment interface. That is a different product—not necessarily a better price.
The NIST supplier-selection guidance explains that focusing mainly on unit cost can raise total ownership cost when supplier capability, quality systems, documentation, and risk are not evaluated together.

Separate Included Items from Unconfirmed Items
Ask each supplier to divide the quotation into standard equipment, customization, optional items, and services.
- Logo, artwork, cabinet colour, and control layout
- Language, software, boot screen, and payment settings
- Export packaging and packing materials
- Spare parts, cables, tools, and fuses
- Manuals, wiring diagrams, and configuration records
- Testing photos and pre-shipment video
Any blank item should be treated as unconfirmed, not assumed to be included.
This is where many low quotations become more expensive. Missing requirements are often discovered after the deposit, when specification changes may create extra cost or delay.
Our arcade machine total cost of ownership guide explains how freight, local adaptation, spare parts, downtime, and technical support affect the real purchase cost.
Compare Evidence, Not General Promises
Statements such as “good quality” or “tested before shipment” are too broad to compare.
Useful evidence may include approved drawings, component lists, software information, wiring records, packaging details, production photos, and a final test video.
For a multiplayer machine, the test should show every player position, controls, sound, screen output, payment input, credit settings, language, startup, and restart—not only a few seconds of gameplay.
The ISO 9001 Auditing Practices Group guidance on external providers recommends confirming purchase requirements before they are communicated to the supplier and applying controls that match the risk of the product or component.

Read the Warranty as a Process
The number of warranty months is only one part of after-sales support.
Buyers should also confirm how faults are diagnosed, which parts are covered, who pays replacement freight, what evidence is required, and whether remote technical support is available.
Most importantly, ask whether the supplier can identify and provide the same PCB, software, wiring, and payment configuration later. A warranty has limited value when the correct replacement part cannot be matched.
Check How Production Changes Are Controlled
A good sample does not guarantee a consistent repeat order.
Ask whether changes to the PCB, screen, wiring, software, controls, payment system, artwork, or cabinet structure require written approval.
This matters especially to distributors. A small unapproved change can create a new spare-parts requirement, another wiring diagram, and another software version that technicians must support.
Our guide to custom arcade machine production explains what buyers should confirm before hardware, software, payment, and cabinet customization begins.
Use a Same-Scope Comparison Sheet
Place every supplier quotation into one table using the same headings:
- Technical specification
- Included customization
- Packaging and shipping information
- Testing and approval evidence
- Spare parts and technical documents
- Warranty and support process
- Replacement and repeat-order continuity
Only compare the final price after every important row has been confirmed.
Industry Insight
The real difference between two quotations is often not equipment quality alone. It is specification certainty.
For a venue owner, uncertainty usually becomes local installation work: the voltage, payment system, software, or cabinet dimensions do not match the site.
For a distributor, uncertainty becomes a long-term support burden. Every undocumented board, harness, connector, or software change creates another configuration that must be stocked, explained, and repaired.
Experienced buyers therefore compare three costs: the purchase price, the cost of unresolved details, and the future cost of configuration changes. The second and third costs rarely appear in the quotation, but they often decide whether the order remains profitable.
Final Thoughts
Compare arcade machine quotations only after the specification, included items, testing evidence, warranty process, and future support have been placed on the same basis.
The best quotation is not simply the lowest number. It is the quotation that leaves the fewest important questions unanswered.
Need Factory Direct Fish Game Solutions?
Contact FUSEN for fish game machines, PCB kits, cabinets, OEM/ODM customization, and long-term technical support.
Get Factory Quote